All case studies
Retail & FurnitureCRMERPPPS3 min read

How Lendor Signature achieved Faster client-to-delivery coordination

Premium Furniture & Home Design · Chișinău, Moldova · Furniture retailer & workshop

Faster

Client-to-Delivery Coordination

Manual, disconnectedReal-time, shared

Streamlined

Order Entry to Production

Manual handoffInstant (ERP → PPS)

Real-Time

Production Status Visibility

NoneReal-time in PPS

Automated

Delivery Readiness Signal

Manual check-insAutomatic via PPS

Full case study and customer testimonial for Lendor Signature coming soon.

Lendor Signature

Case study in progress

01 — The Challenge

What was holding Lendor Signature back?

Lendor Signature's workshop needed a better way to coordinate its team and client orders. Once a client placed a custom order with the shop lead, there was no shared system connecting that order through production to delivery — the shop lead, workers, and delivery team all had to coordinate by hand.

Key pain points before Deliv2Me

Client-to-Delivery Coordination

Manual, disconnected

Order Entry to Production

Manual handoff

Production Status Visibility

None

Delivery Readiness Signal

Manual check-ins

02 — The Solution

How Deliv2Me solved it.

Deliv2Me CRM, ERP, and PPS — along with a new company website — now carry every order from first client contact through to delivery. Orders taken by the shop lead are entered into ERP and instantly visible to the production team in PPS; workers mark each job complete as they finish it, so the delivery team always knows exactly when an order is ready.

Modules deployed:

CRMERPPPS

03 — The Results

Measurable impact from day one.

Faster

Client-to-Delivery Coordination

Manual, disconnectedReal-time, shared

Streamlined

Order Entry to Production

Manual handoffInstant (ERP → PPS)

Real-Time

Production Status Visibility

NoneReal-time in PPS

Automated

Delivery Readiness Signal

Manual check-insAutomatic via PPS

04 — See It Live

The platform Lendor Signature uses every day.

Click the sidebar items to explore the PPS module configured for Retail & Furniture.

app.deliv2me.com / lendor-signature / pps

Live

D2M

Lendor Signature

A

Admin

Online

Dashboard

PPS

Active jobs

24

+2 today

On schedule

96%

+33%

Machine utilisation

84%

+38%

Material waste

3.1%

–63%

Recent Activity

Job JB-1184 complete — Batch A Steel Frame

12m ago

Rush order JB-1191 scheduled — Line 3

45m ago

Material low: MS Steel Sheet 2mm — reorder triggered

2h ago

Weekly plan approved — 26 jobs, 2-week horizon

Today 09:00